Work Breakdown Structure

In project management, a work breakdown structure (WBS) is an exhaustive, hierarchical (from general to specific) tree structure of deliverables and tasks that need to be performed to complete a project. The purpose of a WBS is to identify terminal elements (the actual items to be done in a project). Therefore, WBS serves as the basis for much of project planning. Work breakdown structure is a very common project management tool. Many United States government statements of work require work breakdown structures.

How to build a WBS

Whether the WBS should be activity-oriented or deliverable-oriented is a subject of much discussion. There are also various approaches to building the WBS for a project (see e.g. How to Build a Work Breakdown Structure below). Project management software, when used properly, can be very helpful in developing a WBS, although in early stages of WBS development, plain sticky notes are the best tool (especially in teams). An example of a work breakdown for painting a room (activity-oriented) is, to state the obvious:
  • Prepare materials
    • Buy paint
    • Buy a ladder
    • Buy brushes/rollers
    • Buy wallpaper remover
  • Prepare room
    • Remove old wallpaper
    • Remove detachable decorations
    • Cover floor with old newspapers
    • Cover electrical outlets/switches with tape
    • Cover furniture with sheets
  • Paint the room
  • Clean up the room
    • Dispose or store left over paint
    • Clean brushes/rollers
    • Dispose of old newspapers
    • Remove covers
The size of the WBS should generally not exceed 100-200 terminal elements (if more terminal elements seem to be required, use subprojects). The WBS should be up to 3-4 levels deep. Each level should be 5-9 elements broad. These suggestions derive from the following facts:
  1. short-term memory capacity is limited to 5-9 items.
  2. having fixed time to plan a project, the more terminal elements you have, the less time there is to pay attention to any single one of them. Consequently, your estimates are less thought-through.
  3. the more terminal elements you have the more there are potential dependencies among them (see fact 2 above for consequences).

Books

  • Carl L. Pritchard. Nuts and Bolts Series 1: How to Build a Work Breakdown Structure. ISBN 1890367125
  • Project Management Institute. Project Management Institute Practice Standard for Work Breakdown Structures. ISBN 1880410818
  • Gregory T. Haugan. Effective Work Breakdown Structures (The Project Management Essential Library Series). ISBN 1567261353

Links

See also

 

<< PreviousWord BrowserNext >>
willamette valley
wood
widget
wheel
whaling
wipe
the wizard of speed and time
word problem for groups
waring's problem
williams tube
william of orange
wallace and gromit
world trade center
one world trade center tenants
two world trade center tenants
william saroyan
world food programme
world health organization
world meteorological organization
who (disambiguation)
wal mart
washington dulles international airport
wilson flagg
william s. burroughs
william m. feehan
windsor, ontario
william marsh rice
writing system
wroclaw
war of the spanish succession
western european union
list of worldcons
wyoming
william topaz mcgonagall
western australia
weed
william of ockham
william paley
weightlifting
warsaw pact
wakeboarding
weak nuclear force
wanda a. green
william pitt, 1st earl of chatham