| style="text-align: center" colspan="2"| |
| tyle="color: white; height: 30px; background: navy;"| Career | style="color: white; height: 30px; background: navy;"| |
| rdered: | 13 September 2002 |
| aid down: | November or December 2005 (scheduled) |
| aunched: | April 2006 (scheduled) |
| ommissioned: | November or December 2007 (scheduled) |
| omeport: | Pearl Harbor (planned) |
| olspan=2 align="center" style="color: white; background: navy;"|General Characteristics |
| isplacement: | 6600 tons light, 9200 tons full, 2600 tons dead |
| ength: | 155.7 meters (511 feet) overall, 143.5 meters (471 feet) waterline |
| eam: | 20.1 meters (66 feet) extreme, 17.9 meters (59 feet) waterline |
| raft: | 10 meters (33 feet) maximum, 6.7 meters (22 feet) limit |
| ropulsion: | Four General Electric LM2500-30 gas turbines, two shafts, 100,000 shp |
| peed: | 30+ knots (designed) |
| omplement: | 32 officers, 348 enlisted |
| rmament: | one 32-cell, one 64-cell Mark-41 vertical launch systems, 96 RIM-67 SM-2, BGM-109 Tomahawk or RUM-139 VL-Asroc, missiles one five-inch gun, two 25mm cannon, four 12.7mm machineguns two Mark-46 triple torpedo tubes |
| ircraft: | two SH-60 Sea Hawk helicopters |
| otto: |