Planning Fallacy

The planning fallacy refers to the tendency to underestimate task-completion times. Real-life examples in public policy may include the construction of the Sydney Opera House and the Big Dig, both of which ran many years past their planned schedule. In one study, 37 students were asked to estimate the completion times for their senior theses. The average estimate was 33.9 days. Only about 30% of the students were able to complete their thesis in the amount of time they predicted, and the average actual completion time was 55.5 days. Some have attempted to explain the planning fallacy in terms of impression management theory. Compare to procrastination.

See also

References

  • Buehler, R., Griffin, D., & Ross, M. (1994). Exploring the "planning fallacy": Why people underestimate their task completion times. Journal of Personality and Social Psychology, 67, 366-381.
  • Buehler, R., Griffin, D., & Ross, M. (2002). Inside the planning fallacy: The causes and consequences of optimistic time predictions. In T. Gilovich, D. Griffin, & D. Kahneman (Eds.), Heuristics and biases: The psychology of intuitive judgment, 250-270. Cambridge, UK: Cambridge University Press.

 

<< PreviousWord BrowserNext >>
rason
go (sarah bettens)
hurricane donna
terrance dicks
lorne robson
recognition heuristic
u.s. marxist leninist organization
mdoc
otis, oregon
dustin brown
permissible exposure limit
slug (disambiguation)
slug (mass)
hurricane frances (disambiguation)
u.s. congressional delegations from washington
slug (projectile)
petit verdot
frank goldspink
civicspace
hurricane iniki
lalla meryem
curtis brown (hockey)
immediately dangerous to life and health
manrope knot
alert dialog box
potteries
modular exponentiation
desmond mason
alfred pellan
kelly buchberger
adrenaline junkie
u.s. highway 340
o clone
isabell masters
u.s. highway 341
matthew walker knot
list of zip codes in wyoming
u.s. highway 441
gerd gigerenzer
felix borowski
u.s. highway 641
paperboy (video game)
jan bulis
serpent mound