Norwegian Railway Signals

The signaling system used on the Rail transport in Norway is regulated by the Regulations of December 4th, 2001 no. 1336 about signals and signs on the state's railway network and connected private tracks. The first signalling system on the Norwegian railway system was a mechanically operated semaphore system introduced at Drammen station in 1893. The first electrically operated light signal system was delievered by AEG in 1924. Today, only electrically operated light signals are used.

Signalling remedies

The following signalling remedies are used:
  • Signal flags
  • Hand-held signal lamps
  • Signal whistle
  • The signal giver's arms
  • Fixed light signals
  • Fixed sound signals
  • Signal signs
  • Orientation poles
  • Locomotive whistle
  • Locomotive and train signal lamps

The fundamental meaning of the signal colors

  • Red does always indicate "stop".
  • Violet indicates that the appurtenant level crossing signal shows "Stop short of the level crossing".
  • Yellow indicates "caution".
  • Green indicates "permission to run".
  • White indicates "clear line".

Light signals

The regular light signals show one of these signals:

Main signals

style="background-color: #cccccc" | Image style="background-color: #cccccc" | Signal style="background-color: #cccccc" | Meaning style="background-color: #cccccc" | Used in
Signal 20A - Stop The train must stop short of the signal. Home signals, block signals.
  Signal 20B - Stop The train must stop short of the signal. Departure signals, inner signals.
  Signal 21 - Proceed (in different track) The train can proceed, usually via one or more deviant switches. Home signals, departure sigals, inner signals, block signals.
Signal 22 - Proceed The train can proceed, not via deviant switches. Home signals, departure sigals, inner signals, block signals.

Distant signals

style="background-color: #cccccc" | Image style="background-color: #cccccc" | Signal style="background-color: #cccccc" | Meaning
Signal 23 - Expect stop The appurtenant main signal shows signal 20A or 20B.
Signal 24 - Expect to proceed (in different track) The appurtenant main signal shows signal 21.
Signal 25 - Expect to proceed The appurtenant main signal shows signal 22.

 

<< PreviousWord BrowserNext >>
hjrvard
mary fleener
list of great british trees
duke pearson
austin maxi
guttman scale
setlist
on a pale horse
gallery of sega genesis screenshots
cityrover
bob kiley
north wessex downs aonb
ck722
schema (psychology)
international independent hockey league
ella jenkins
aarre merikanto
monster house
kringle
suite bergamasque
andrew brewin
nikos konstantopoulos
feet of fury
olga petrova
karin sder
piaget's theory
folkland
solax studios
danny wilson
edward williams
alan kulwicki
seattle japanese garden
lockheed xb 30
michael breaugh
alexandre thodore brongniart
michael turner
una
fjrdhundraland
hanlin academy
attundaland
still cruisin'
herstmonceux
michael turner (artist)
temp