Los Alamos (Afdb-7)

colspan="2"|
lign ="center" style="color: white; height: 30px; background: navy no-repeat scroll top left;"|Career align ="center" style="color: white; height: 30px; background: navy no-repeat scroll top left;"|USN Jack
aunched: March 1945
ommissioned: n/a
eactivated: early 1990's
ate: Disassembled
olspan="2" align="center" style="color: white; height: 30px; background: navy no-repeat scroll top left;"|General Characteristics
isplacement: 30,800 tons
ength: 825 ft 3 in
eam: 246 ft 5 in
raught: 8 ft 8 in
ropulsion: none
peed: n/a
omplement: 187
rmament: 14 40mm guns, 14 20mm guns
ABSD-7, an advance base section dock, was constructed of seven advance base docks (ABD) as follows: ABD-37, ABD-38, ABD-39, and ABD-40 were built by Chicago Bridge & Iron Co., Morgan City, La., and completed in December 1944 and January and February 1945; ABD-51 and ABD-52 were built by Pollock Stockton Shipbuilding Co., Stockton, Calif., and completed in January and March 1945; and ABD-58 was built by Pittsburgh Des Moines Steel Co., Pittsburgh, Pa., and completed in October 1944. The seven advance base docks were towed to Mare Island Navy Yard where they were erected and assembled into ABSD-7. Completed in March 1945, the advance base section dock began duty at Mare Island, and she served there until placed on the inactive list in March 1946. Subsequently, she reclassified to AFDB*7, an auxiliary floating drydock, in August 1946. She was disassembled and towed to the east coast where she entered the Atlantic Reserve Fleet at Green Cove Springs, Fla., in January 1947. Early in 1961, sections A, B, C, and D of AFDB‑7 were towed across the Atlantic Ocean to Holy Loch, Scotland, where on 3 March 1961 the Navy established an important base for fleet ballistic submarines. A detachment of Seabees from MCB-4 erected and assembled the four sections. Completed 10 November, the auxiliary floating drydock was placed in service as Los Alamos (AFDB-7). Assigned to SubRon 14, Los Alamos began drydock service for the FBM boats. Converted for use by submarines, she had the following characteristics: dp. 18,795 (lt.); l. 513'; b. 246'5"; dr. 9'3" (lt.), 67'4" (subm. max.); s. NSP; cpl. 143; a. none. Late in 1961 she carried out her first SSBN drydocking of USS George Washington (SSBN-598). Since then, she has served submarines of the Highland Squadron at Holy Loch, and in doing so has strengthened the security and defense of the Nation and the free world. She has supported refit and repair operations by submarine tenders USS Proteus (AS-19), USS Hunley (AS-31), and USS Simon Lake (AS-33). In February 1964 she completed successfully the first off center docking of a Polaris submarine. By providing keel blocks preset for two separate classes of SSBN boats, Los Alamos added immeasurably to the sites repair flexibility. Into 1969 she continued to provide docking services for Polaris submarines, whenever needed in weather foul or fair. In the early 1990's Los Alamos was disassembled into sections and returned to the United States. In 1996 six of the original ABSD-7 sections transferred to the Brownsville Navigation District, TX. Another had been turned over to the U.S. Army in 1968.

Reference

L

 

<< PreviousWord BrowserNext >>
riomaggiore
oak harbor
oak hills
julian mcgauran
jung myung seok
renco group
daylight (movie)
ahmed al maktoum
otto von guericke university of magdeburg
oak valley
belgrano
robert wever
video archives
john gordon, 16th earl of sutherland
linguistic determinism
scholastic chess club
japanese admirals of the fleet
amity high school
oakfield
spaced out
oakford
aurelian townsend
guy consolmagno
fifty million frenchmen
mozilla europe
mozilla japan
chuck (album)
lefebvre
alaska (band)
oakland park
ozzy and drix
marc hyman
bev francis
hanson records
london regiment
differential diagnosis
oakport
alaska!
shawn reaves
clarinet concerto (mozart)
the mountain school
ski pole
ed nelson
oaks