Demand Factor

In telecommunication, the term demand factor has the following meanings: 1. The ratio of (a) the maximum real power consumed by a system to (b) the maximum real power that would be consumed if the entire load connected to the system were to be activated at the same time. Note: The maximum real power is usually integrated over a specified time interval, such as 15 or 30 minutes, and is usually expressed in kilowatts. The real power that would be consumed if the entire load connected to the system were to be activated at the same time is obtained by summing the power required by all the connected equipment. This load is expressed in kilowatts if the consumed real power is expressed in kilowatts. 2. The ratio of (a) the maximum power, integrated over a specified time interval, such as 15 or 30 minutes, and usually expressed in kilowatts, consumed by a system, to (b) the maximum volt-amperes, expressed in kilovolt-amperes if the power is expressed in kilowatts, integrated over a time interval of the same duration, though not necessarily during the same interval. Note: Charges for electrical power may be based on the demand factor as well as the kilowatt-hours of electrical energy consumed. Source: from Federal Standard 1037C and from MIL-STD-188

 

<< PreviousWord BrowserNext >>
data bank
data compaction
data element
data forwarder
data integrity
data link
data service unit
data signaling rate
data transmission circuit
date time group
db (car)
db(a)
dbm
dbrn
data circuit terminating equipment
decollimation
decrypt
degradation
degree of isochronous distortion
degree of start stop distortion
dejitterizer
delay
delay encoding
delay line
delta modulation
demand assignment
demand load
desensitation
design objective
detector
deterministic routing
d 4
pulse dialing
dial up
dielectric
dielectric strength
differential encoding
differential manchester encoding
diffraction grating
digital access and cross connect system
digital filter
digital milliwatt
digital multiplex hierarchy
digital signal 0