Automatic Warning System

The Automatic Warning System refers to the specific form of limited cab signalling introduced in 1948 in the United Kingdom to help train drivers observe and obey warning signals, yellow or green.

BR AWS

The BR AWS consists of:
  • a permanent magnet between the rails
  • an electro-magnet between the rails
  • a cab indicator that can show a black disk or a yellow and black "exploding" disk.
  • a control unit that connects the system to the brakes on the train.
When the train passes a distant signal at yellow, the electro-magnet is de-energised, the indicator disk changes to yellow on black, and a hooter sounds. If the driver fails to acknowledge the warning, the brakes are applied. When the train passes a distant signal at green, the electro-magnet is energised, the indicator disk changes to all black, a bell chimes. No acknowledgement is required from the driver. With mechanical signalling, the AWS system was only installed at distant signals, but with multi-aspect signalling, the AWS is fitted at all main line signals.

Disadvantages

The AWS has a very low bandwidth, only 2 bits of information. Even though a multi-aspect signal can display several bytes of information, the AWS can only distinguish between 2. The AWS is an advisory system, and can be easily overridden by habituated reactions of the driver, especially when the driver proceeds on multiple yellow signals. Also, there is no compulsary stop when a red signal is passed. The newer TPWS overcomes some of these problems.

GWR AWS

The GWR AWS developed circa 1906 is very similar to the BR one, the main difference being that it used a contact ramp rather than non-contact magnets. This ramp was located on the approach to the distant signal, and pushed up slightly higher than the level of the rail on a plunger mounted on the engine. If the ramp was engergized, that gave the green signal. If the ramp was de-energized, that gave the yellow signal. For many years Western Region locomotives were dual fitted with both GWR and BR AWS system, and the GWR system was gradually phased out. The GWR system's main disadvantage is the wear and tear on the ramp and the plunger, which is avoided with the non-contact BR version.

Other countries

See Also

 

<< PreviousWord BrowserNext >>
tibesti mountains
css shenandoah
tripwire
segmentation and reassembly
photon soup
azmaveth
robert tressell
lg1
kotri
vietnamese air force
abu tammam
matthew locke (u.s. congress)
southall rail crash
northern limestone alps
southern limestone alps
central eastern alps
surak class starship
resolved sideband cooling
tang tang
alexander ragulin
little britain, new york
sequoia class starship
eusko alkartasuna
override (short film)
colossus class battleship
renaissance class starship
topper (archaeological site)
school of tropical medicine
frederick birks
count your sheep
merced class starship
central forensic science laboratory
mediterranean class starship
korolev class starship
hendregadredd manuscript
runoff (program)
renaissance party
istanbul class starship
hirschau
hokule'a class starship
robert blair (vc)
kilchberg
deneva class starship
v. s. pritchett